Which of these patterns on a control chart would require a worker to stop the process and investigate for an assignable cause?
a. one point below the lower control limit
b. a run of three consecutive points above the center line
c. two out of three points close to the center line
d. a run of five points alternating up and down



Answer :

Other Questions