Which of the following is NOT a requirement for a landfill being built today? (2 points)
A.
O vent pipes must be installed
for removing methane
B. it must be a specified distance (miles) from a city or other populated area
C,
it must be lined with clay and plastic
DO it must have systems for collecting and treating leachate



Answer :

Other Questions