Placker Corporation uses a job-order costing system with a single, plantwide, predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on a total fixed manufacturing overhead cost of $155,000, variable manufacturing overhead of $3.40 per machine-hour, and 50,000 machine-hours. Recently, Job A881 was completed with the following characteristics:



Answer :

Other Questions