2 Vivo
energy
has
is 30.000
a fuel tank reservior whose cap
due to the effects of weather. The tank is cylindrical.
The tank requires painting because its colour has fedel
shope and its height is 10% rather than it's diameter. The
manager in charge of maltaining wishes to have its outer
Surface / top and curved surface painted She conducted
a certain Ugandan paint producing company to purchase the
tine of paint required
Support material
Every
5 litre tin of paint costs 40,00056 and
box of the surface
As
Task
can paint
a soles agent of the paint Company. Advise the
repair of the manager on the cast of paint needed for the
maintenance
reserved tank.
​



Answer :

Other Questions