The Universal Manufacturing Company has a single assembly line that feeds two drill presses in parallel. As partially completed products come off the line, they are lined up to be worked on as drill presses become available. The units arrive at the workstation (containing both presses) at the rate of 90 per hour (Poisson distributed). Each press operator can process an average of 65 units per hour (Poisson distributed).



Answer :

Answer:  there are approximately 1.55 units in the system and each unit spends about 0.017 hours (or approximately 1.02 minutes) in the system.

Step-by-step explanation: